Construction Equipment: ZYJ320B, the equipment is customized according to the customer Construction Period: begin the pile testing in June 26, 2006 Geological Condition: 0-6m, backfill of sand, stone, clay, and etc.; 6-6.5m, sand stratum; 6.5-12m, silt; 12m, weak weathered rock stratum Requirements: 12m piling depth; complete pile driving of 1250 meters before July 2006; the tonnage should be 120 ton. Customer Comments: Sunward has complete techniques and provides effective service; the performance of the machine is very stable.
|